Poor thing really messed her leg up--
One of her nurses liked the hat and asked if I'd make her an identical one and another hat out of a different pattern in gray.
A little over a month ago, I made a scarf. I forgot what pattern I used but it came from one of the yarn companies sites like lion, bernat or one of the others (I think). I made another hat like the gray one but I used a flower on it instead of the bow-like trim.
Ray has been a bit slow with the bathroom remodel. We've changed the design of the shower tile layout a few times. He also doesn't like working with the subway tiles and had wanted to use 12x12 inch tiles but I pouted long enough to convince him otherwise. ;)
For some reason, many of the pictures I take in the bathroom have these orb-like blobs in them. Maybe we have ghosts?!
All the drywall has been finished as has the electrical being redone and ready for the fixtures. He installed a new dual flush toilet and had to remove it and take it back because there was a defect--when he did the first test flush water spewed out a crack that looked like a defect in the manufacturing. We got a different type and it isn't a dual flush but does conserve water.
See the little crack at the top on your left.
This is the good toilet. The drywall behind it is all done now.
I think I'm caught up here except for a pair of slippers I made. I'll put them in here later on.
Take care y'all!
Sharon